Infernal_Death
Well-known member
Hi all
I just took some pics of my nearly ready calrec. Both channels work and metalwork is done. I just need to hook up the first channel properly and everything is ready to go. Here are the pics:
Yes the pics are small but i tried to stay in between the dimensions in the rules. The wiring is still messy but it was just for testing. Before racking the unit i will rewire it.
As always thanks to Jakob for this very fine project.
P.S. Before you ask, yes it was a pain in the ass to drill those square holes for the switch caps :green:
Flo
I just took some pics of my nearly ready calrec. Both channels work and metalwork is done. I just need to hook up the first channel properly and everything is ready to go. Here are the pics:
Yes the pics are small but i tried to stay in between the dimensions in the rules. The wiring is still messy but it was just for testing. Before racking the unit i will rewire it.
As always thanks to Jakob for this very fine project.
P.S. Before you ask, yes it was a pain in the ass to drill those square holes for the switch caps :green:
Flo